Middle EastSMEC Oil & Gas Solutions LLCinfo@smecong.com+971 50 249 1903

IndiaSMEC Automation Pvt Ltdsales@smecong.com+91 86060 47714

Products

Skidding Current Monitoring System

Skidding Current Monitoring provides operators and engineers with electrical-load visibility across project-defined skidding motors or drives so abnormal loading, imbalance or overload conditions can be investigated during movement.

Inside a drilling rig's VFD room: drive cabinets on both sides and an operator desk at the end

System architecture / typical scope

  • Current measurement per defined drive/motor
  • Signal conditioning/data acquisition
  • HMI/dashboard
  • Alarm thresholds
  • Trend/history
  • Integration with skidding controls where approved

What SMEC can support

  • Requirements and interface review
  • Detailed engineering and approved component selection
  • Panel/package build or integration within SMEC capability
  • Software/configuration where applicable
  • FAT and documentation
  • Site integration, SAT and commissioning
  • Retrofit, troubleshooting and lifecycle support

Applications

Land rigs, offshore modules and other skidded equipment where movement loads require monitoring.

Common questions

Can Skidding Current Monitoring System be supplied for new build, retrofit or replacement?

The lifecycle route depends on the installed base, condition, interfaces, obsolescence and project requirements. SMEC can assess new-build, retrofit, repair or replacement scope where technically valid.

Can existing field wiring or interfaces be retained?

Possibly. Retention depends on survey findings, condition, ratings, compatibility, safety requirements, documentation and the cutover strategy.

What information is required for quotation?

Send the make/model or required specification, datasheets, drawings, ratings, interfaces, fault details where applicable, site location and required date or shutdown/mobilization window.

Have a Skidding Current Monitoring System project to discuss?

Share the existing equipment, drawings, project location and scope of work.

Motor/drive list, current ranges, skidding architecture, control drawings, alarm limits and required display/history.

Submit RFQ