Engineering Reference

Engineering FAQs

Technical Questions. Practical Engineering Answers.

Find answers to frequently asked questions about oil & gas engineering, electrical and instrumentation systems, drilling rig modernisation, industrial automation and digitalisation.

Have a specific engineering challenge? Let's discuss it.

SMEC technicians testing a row of electrical panels, one with a tablet and one kneeling by an open cabinet
Engineering FAQs

Questions engineers ask

62

01Drilling Rig & Offshore Systems

Can an ageing offshore drilling rig be modernised without replacing its entire control system?

Yes, depending on the equipment condition and system architecture. Selective modernisation may include PLC/HMI replacement, drive-control upgrades, new monitoring interfaces and control-panel retrofits while retaining serviceable equipment. SMEC assesses the installed system and defines a suitable engineering and migration scope.

What must be assessed before converting a drilling rig from SCR to VFD?

An SCR-to-VFD conversion requires assessment of motor compatibility, electrical load, transformers, power distribution, harmonics, protection, cooling and control-system interfaces. The conversion may also require motor or auxiliary equipment replacement. An engineering study establishes feasibility and the proposed upgrade scope.

What is the difference between an SCR House and a VFD House?

An SCR House typically provides controlled DC power for compatible drilling motors, while a VFD House supplies variable-frequency AC power to suitable AC motors. Their drive configurations, protection systems and maintenance requirements differ.

Can a jack-up rig's jacking control system be upgraded without replacing its gearboxes?

Potentially. Existing gearboxes and motors may be retained when their condition, ratings and operating interfaces are suitable. Any control-system retrofit must verify braking, load monitoring, interlocks, emergency functions and the safety of the complete jacking arrangement.

What does a drilling monitoring system such as DMS3000 monitor?

A drilling monitoring system consolidates available operational signals into displays, alarms and historical records. Depending on the installed instrumentation and configuration, these can include drilling loads, movement, mud-system parameters and operational activities. Final capabilities depend on the approved system specification.

Can an obsolete top-drive control system be upgraded while retaining the existing top drive?

In certain installations, yes. Feasibility depends on the installed motors, drive system, encoders, feedback devices, braking arrangements and communication interfaces. SMEC can assess the automation and electrical control scope as part of a proposed retrofit.

What is involved in modernising an integrated drilling control system?

The work may include controller upgrades, operator-interface improvements, drive integration, field instrumentation, alarms, communication networks and system testing. Critical interlocks and operating sequences must be validated against the approved drilling equipment requirements.

What electrical and automation checks are required before reactivating a stacked drilling rig?

Typical checks include generators, switchgear, SCR/VFD systems, PLCs, HMIs, instrumentation, cabling, alarms, communication networks and safety-related control interfaces. Reactivation requirements depend on equipment condition, applicable standards and the operator's acceptance criteria.

Can an existing BOP control system be modernised?

SMEC can assess defined electrical, automation, monitoring and control-system requirements associated with BOP equipment. This does not constitute a complete BOP mechanical or hydraulic overhaul, pressure-integrity testing or well-control barrier certification. Those activities require appropriately qualified specialists.

How can drilling contractors reduce risks when upgrading legacy rig automation?

A structured retrofit programme should include an installed-base survey, obsolescence assessment, documented control logic, interface verification, FAT, planned cutover and commissioning. Critical operating and safety functions should be tested before returning the upgraded equipment to service.

02Industrial Automation, PLC, DCS & SCADA

Can an obsolete PLC be replaced without shutting down an entire plant?

In some facilities, phased migration is possible through system segregation, redundancy or planned cutovers. However, physical changeovers and safety-critical interfaces may still require shutdown windows. The migration strategy must be validated before execution.

What is the difference between PLC, DCS and SCADA?

A PLC primarily executes control logic for equipment and processes. A DCS provides distributed process control across plant systems, while SCADA supports supervisory monitoring and control, often across geographically distributed assets. These systems can be integrated.

What are the major risks in migrating a legacy control system?

Risks include undocumented logic, obsolete hardware, unavailable program backups, incompatible field interfaces, communication failures and inadequate testing. A migration study should identify these issues and establish a controlled implementation plan.

Can control systems from different OEMs be integrated?

Often, yes, through compatible communication protocols, gateways, OPC interfaces or approved APIs. Integration depends on platform versions, licensing, access permissions, system architecture and cybersecurity requirements.

Can existing field instruments and wiring be retained during PLC/DCS migration?

Potentially. Existing instrumentation and wiring may be retained if their condition, signal types, electrical ratings, isolation and interface compatibility meet the requirements of the replacement system.

What is the difference between control-system migration and modernisation?

Migration generally moves existing control functions onto another platform. Modernisation can also improve system architecture, diagnostics, networks, operator interfaces, maintainability and operational functionality.

What should be included in a brownfield automation upgrade study?

A brownfield study should review the installed controller and I/O inventory, functional requirements, documentation, interfaces, obsolescence, cybersecurity, shutdown constraints, testing and rollback arrangements.

Can pipeline SCADA and RTU systems be upgraded without replacing all field equipment?

Selective upgrades may be possible when existing sensors, RTUs, communication links and field interfaces remain serviceable and compatible. Pipeline control, telemetry and cybersecurity requirements must be evaluated before selecting the replacement architecture.

How can automation upgrades be planned around refinery or gas-plant shutdowns?

Engineering, programming, panel assembly and FAT can often be completed before the shutdown. The remaining activities should be organised around approved isolation procedures, installation sequencing, interface testing, commissioning and contingency plans.

03Electrical Power, E&I & Engineered Packages

What is the difference between MCC, PCC and PLC control panels?

An MCC distributes and controls electrical power to motors. A PCC manages power distribution and protection, while a PLC panel houses industrial controllers and associated equipment used for automation and control.

Can an ageing Motor Control Centre be retrofitted rather than completely replaced?

Possibly. Retrofit feasibility depends on busbar condition, enclosure integrity, electrical ratings, protection coordination, available space and replacement-component compatibility. An engineering assessment is required before deciding between retrofit and replacement.

What is an E-House, and where is it used?

An electrical E-House is a prefabricated enclosure containing power distribution, protection, drives, control or automation equipment. It can be used at drilling sites, process facilities, terminals and remote industrial installations where modular electrical infrastructure is suitable.

What should be considered when engineering an E-House for oil and gas applications?

Design considerations include electrical loading, cooling, structural requirements, fire protection, hazardous-area classification, equipment accessibility, transport constraints, environmental conditions and project specifications.

How does a generator Power Management System support drilling or industrial operations?

A Power Management System can coordinate generator operation, load sharing, synchronisation, power monitoring and load-management functions. Depending on the approved design, it can also support protective responses intended to maintain electrical-system stability.

Can existing generator synchronisation and control panels be modernised?

Yes, where technically feasible. Upgrades may involve synchronising controllers, protection relays, monitoring interfaces, control logic and communication networks, subject to compatibility and electrical-system studies.

What determines the capacity of an industrial battery charger and DC power system?

Battery type, DC system voltage, continuous load, autonomy, recharge time, environmental conditions and redundancy requirements influence equipment selection. Battery sizing and charger sizing should be evaluated together.

Can EPC contractors outsource complete E&I and automation packages to SMEC?

SMEC can assess defined E&I and automation packages covering engineering, equipment integration, panels, testing and commissioning. The scope, procurement responsibilities, interfaces, standards and delivery boundaries must be agreed for each project.

What documents are needed to engineer or quote an electrical control panel?

Useful inputs include a single-line diagram, load list, functional specifications, I/O list, equipment ratings, control philosophy, enclosure requirements, applicable standards and site conditions. Preliminary enquiries can be reviewed even when some documents are unavailable.

04Industrial Safety, Flare Ignition & Hazardous-Area Systems

Can an obsolete flare pilot ignition system be modernised without replacing the complete flare structure?

In some applications, ignition controls, pilot monitoring, electrical components and associated interfaces can be modernised independently. A site-specific assessment is required to establish compatibility with the existing burners, pilot assemblies and mechanical infrastructure.

What is the difference between a flare ignition system and a flame monitoring system?

A flare ignition system initiates ignition of the pilot or burner. Flame monitoring verifies flame presence using an appropriate detection method. Both functions may be incorporated into a coordinated flare-system design.

What information is needed to assess a flare ignition system replacement?

Relevant information includes existing OEM details, equipment drawings, number of pilots, ignition philosophy, gas conditions, available power, monitoring method, hazardous-area classification and existing control interfaces.

What is a Fire & Gas detection system in an oil and gas facility?

A Fire & Gas system monitors selected fire and hazardous-gas conditions and can initiate alarms or configured protective responses. Detector selection, coverage, voting logic and system interfaces depend on the facility's hazard assessment and approved design.

What is the difference between ESD and SIS?

An Emergency Shutdown (ESD) system performs defined shutdown actions during abnormal or hazardous conditions. A Safety Instrumented System (SIS) comprises instrumented functions designed to achieve specified risk reduction. An ESD system may form part of an SIS, depending on its design.

Does every ESD system require SIL certification?

No. Safety Integrity Level requirements are assigned to specific safety instrumented functions through appropriate risk assessment and safety lifecycle processes. SIL claims must be supported by the applicable design, verification and validation evidence.

Can an existing SIL-rated safety system be upgraded?

Yes, subject to a controlled engineering and functional-safety process. Changes may require reassessment of safety requirements, logic, hardware, interfaces, testing and validation to ensure the required safety integrity is maintained.

What does a mud gas detection system monitor during drilling?

Mud gas detection equipment monitors selected gases associated with drilling-fluid returns. Depending on the equipment configuration, the system may support gas measurement, alarms and operational monitoring. It does not replace the rig's broader well-control and gas-safety procedures.

What certifications should be checked when selecting CCTV or electrical equipment for hazardous areas?

Equipment must be suitable for the applicable hazardous-area classification, gas group, temperature class, environmental conditions and local regulatory requirements. Relevant IECEx, ATEX or other required certification documents should be reviewed against the exact supplied model and installation.

How are PAGA systems integrated with offshore emergency and safety systems?

Public Address and General Alarm systems can distribute announcements and configured alarm signals across designated areas. Interfaces with fire and gas, ESD or other systems must follow the approved cause-and-effect philosophy and applicable offshore requirements.

05Marine & Offshore Vessel Automation

Can an ageing vessel ballast control system be modernised?

Yes, depending on the existing valves, actuators, instrumentation, control hardware and system documentation. A retrofit may improve monitoring and control while retaining compatible field equipment. Vessel-specific safety and classification requirements must be considered.

What should be assessed before upgrading a marine boiler control system?

The assessment should examine existing controls, burner management, safety interlocks, combustion instrumentation, alarms, equipment condition, OEM requirements and applicable marine rules. Safety-critical functions require appropriate verification and acceptance.

Can obsolete vessel alarm monitoring systems be migrated to a modern PLC/HMI platform?

Potentially. Migration requires evaluation of the original controller, I/O, alarm logic, available backups, communication interfaces and operating requirements. Alarm functionality and applicable class requirements must be verified during commissioning.

How can electrical automation upgrades be planned during vessel drydocking?

Engineering design, procurement, programming and FAT should be completed in advance where possible. Installation and commissioning should then be coordinated with the drydock schedule, vessel access, class requirements and other concurrent work.

Can a vessel's existing instrumentation be integrated into a new monitoring platform?

Often, provided the sensors, protocols and signal interfaces are compatible. Data collection, alarm handling, network segregation and required class or cybersecurity considerations should be established during system design.

How can marine boiler and auxiliary machinery automation improve maintainability?

Modern control interfaces can improve equipment status visibility, alarm diagnostics and access to operating information. The benefits depend on the implemented functions, equipment condition and maintenance practices.

What support can SMEC provide for offshore vessel electrical and control-system retrofits?

SMEC can assess defined electrical, instrumentation, automation, panel engineering and commissioning requirements for offshore and marine assets. The scope is established according to vessel condition, available documentation, project location and applicable approvals.

06Digitalisation, Industrial AI & Asset Intelligence

Can NexView AI video analytics work with existing CCTV cameras?

Potentially. Existing IP cameras may be usable when their video streams, resolution, image quality, coverage and network performance meet the selected analytics requirements. A compatibility and use-case assessment is required before implementation.

What industrial safety events can AI video analytics help identify?

Depending on the configured models and camera coverage, AI video analytics may assist with PPE compliance monitoring, restricted-area intrusion, personnel movement, smoke or fire indicators and selected unsafe conditions. Detection performance must be validated for each environment.

Can AI video analytics replace conventional fire and gas detection systems?

No. Video analytics may provide supplementary visual awareness, but it should not be treated as a replacement for certified fire and gas detection or safety instrumented functions.

How does NexWave support remote monitoring of industrial assets?

NexWave is positioned for remote asset monitoring by making selected equipment and operational data accessible through an appropriate connected architecture. The implementation depends on available signals, integration methods, communications infrastructure and security requirements.

Can offshore assets be monitored remotely when satellite connectivity is limited?

A remote monitoring system may use local data collection, prioritised transmission and buffering where supported. Connectivity limits, data latency and recovery requirements must be assessed before defining the solution.

What is the difference between predictive maintenance and preventive maintenance?

Preventive maintenance generally follows defined time or usage intervals. Predictive maintenance uses available equipment-condition information and analysis to help identify developing problems and support maintenance decisions.

What information does ProSet360 require for predictive maintenance?

Potential inputs include equipment-condition measurements, operating parameters, alarms, maintenance records and failure history. Relevant data depends on the asset, failure modes and analytics approach. A baseline assessment is needed before predictive capabilities can be defined.

What is the difference between an industrial digital twin and SCADA?

SCADA primarily supports operational monitoring and control. A digital twin connects an asset representation with relevant operating data, models and relationships to support analysis or engineering decisions, depending on the implemented scope.

Can NexVerse be introduced without replacing an existing PLC or SCADA system?

Potentially. A digital twin may consume data from existing systems through approved interfaces while leaving their primary control responsibilities unchanged. Feasibility depends on data availability, system integration, model requirements and cybersecurity.

How can industrial fuel and energy monitoring support operational decisions?

Fuel and energy monitoring can consolidate consumption, operating hours, load and other available measurements. This information may help teams examine operating patterns, investigate unusual consumption and identify areas for further efficiency assessment.

07Project Delivery, Commissioning & Lifecycle Support

What is the difference between FAT and SAT?

Factory Acceptance Testing (FAT) verifies specified equipment or system functions before dispatch, usually at the manufacturer's or integrator's facility. Site Acceptance Testing (SAT) verifies applicable functions after installation and integration at the project site.

What is the difference between a greenfield and brownfield automation project?

A greenfield project generally involves engineering systems for a new installation. A brownfield project modifies an existing facility and must address installed equipment, existing interfaces, operational constraints and migration risks.

Can SMEC undertake turnkey electrical and automation packages?

SMEC can evaluate turnkey responsibility for clearly defined electrical, instrumentation, automation or control-system packages. Deliverables and boundaries covering engineering, procurement, manufacturing, testing, installation and commissioning are agreed for each project.

Can SMEC support projects involving multiple automation OEMs?

SMEC can assess multi-OEM integration and modernisation requirements where technical documentation, system access, interfaces and applicable permissions are available. Feasibility depends on the specific equipment and project scope.

What is required before commissioning a modernised industrial control system?

Commissioning preparation normally includes approved drawings, functional specifications, completed inspections, software and configuration records, relevant test procedures, interface checks and authorised site access. Safety-critical functions require their applicable validation procedures.

Can engineering services be provided remotely as well as onsite?

Some engineering activities, such as design reviews, documentation, configuration and technical support, may be suitable for remote delivery. Activities requiring physical inspection, installation, testing or commissioning may require onsite personnel. Feasibility is evaluated by assignment.

What information should be included when sending an RFQ to SMEC?

Share the available technical specifications, equipment details, drawings, required scope, project location and expected schedule. For retrofits, existing equipment information, operating issues and shutdown constraints are especially useful. Incomplete enquiries can still be submitted for initial technical review.

Have an engineering challenge that isn't covered here?

Share your requirements with SMEC's engineering team.

Send the requirement

Share the existing equipment, drawings, project location and scope of work.

Explore the relevant engineering page or send a technical requirement. Recommended RFQ inputs: project/asset, existing OEM/model, scope, drawings or specification, required date, site location, and any shutdown/mobilization constraint.

Submit RFQ