Project Engineering

Brownfield Engineering

Brownfield engineering begins with what already exists. SMEC assesses installed equipment, drawings, software, field wiring, interfaces, spares, obsolescence and operating constraints before defining what can remain and what must change.

A SMEC engineer with a checklist walking down an operating process plant
Greenfield & Brownfield Engineering

New Infrastructure. Existing Operations. One Practical Engineering Plan.

A greenfield project needs coordinated electrical, control and instrumentation architecture from the outset. A brownfield project introduces a harder question: how will the new equipment work with the plant that is already running? SMEC supports engineering of both new infrastructure and operating-asset modifications.

Services span surveys, interface registers, electrical distribution, PLC/SCADA, instrumentation, phased cutovers, FAT/SAT and commissioning support.

Explore engineering capabilities

Decision framework

  • Keep — technically healthy and supportable
  • Repair — viable equipment with isolated faults
  • Retrofit — retain the asset, replace a subsystem
  • Migrate — move controls/data to a supported platform
  • Replace — when risk, supportability or economics justify it

Applications & Systems

Select a related system to open its dedicated product or system page.

Project Evidence

Operating Production Facility — Brownfield Control-System Upgrade

An operating facility required automation changes around existing equipment and live interfaces. The project summary covers site surveys, interface mapping, staged modifications, loop checks and restart verification.

  • Case studyOffshore rig, Dubai

    Offshore Rig — Emergency MCC, Transformer and DG Switchboard Upgrade

    Problem · SMEC scope · Architecture · Testing
    Problem
    The rig’s emergency power system needed upgrading to improve reliability, efficiency and safety in emergencies, minimise downtime and make maintenance easier.
    SMEC scope
    SMEC designed, manufactured, supplied, installed and commissioned a DG switchboard panel in the MSB room, a DG power isolation panel near the generator, a new transformer and a new Emergency Motor Control Centre, and supplied, installed and commissioned a new emergency generator excitation unit.
    Architecture
    Main switchboard extended with 100x8mm copper bus bars, 4-run per phase, and an additional generator section; 1250 kVA, 600/480 V delta-star dry-type transformer with Class H insulation; modular EMCC with compact bus bars in a prefabricated enclosure for a constrained space; arc-fault detection relays on the isolation panel; Basler excitation unit for the 1625 kVA, 1300 kW emergency alternator.
    Testing
    Load flow analysis for the switchboard extension; harmonic analysis and insulation testing on the transformer; real-time voltage regulation testing and excitation tuning on the generator. Every item installed and commissioned, and confirmed working by rig staff.

Engineering Approach — Designing the new around the operating reality

Greenfield engineering allows the power and control architecture to be established from first principles. Brownfield engineering starts with constraints: existing switchgear, field wiring, installed controls, documentation quality, physical access and equipment that cannot be taken out of service.

Site surveys, tie-in registers, as-built verification, phased installation plans and pre-tested control interfaces are essential to credible execution. The engineering plan should show how each modification is sequenced, isolated, tested and handed back to operations.

Common questions

Can new systems be tied into an operating plant?

Yes, subject to a site survey, capacity review, interface register, safety requirements and an agreed execution or shutdown plan.

What drawings should be supplied?

Existing and proposed SLDs, P&IDs, layouts, equipment lists, as-builts and known site restrictions.

Have a Brownfield Engineering project to discuss?

Share the existing equipment, drawings, project location and scope of work.

Send the existing make/model, drawings, software backups and shutdown window. Recommended RFQ inputs: project/asset, existing OEM/model, scope, drawings or specification, required date, site location, and any shutdown/mobilization constraint.