Middle EastSMEC Oil & Gas Solutions LLCinfo@smecong.com+971 50 249 1903

IndiaSMEC Automation Pvt Ltdsales@smecong.com+91 86060 47714

Product system

Drilling Rig Power Houses & Power Control Rooms (PCR)

Integrated Rig Power Distribution, Drive Control & Modular Electrical Packages

SMEC provides drilling rig power house engineering, Power Control Room (PCR) integration and electrical system retrofit solutions for onshore and offshore drilling applications.

Designed around the rig's electrical architecture, these transportable power packages can integrate generator controls, Power Management Systems (PMS), VFD/SCR equipment, switchgear, MCC/PCC panels, transformers, UPS/DC supplies and industrial automation interfaces.

SMEC supports new-build electrical packages, replacement power houses and brownfield upgrades through project-specific engineering, panel integration, testing and commissioning support.

  • New Power Houses
  • VFD/SCR Integration
  • Modular PCR Packages
  • Rig Electrical Retrofits
A white SMEC VFD house standing on its wheeled skid on the workshop floor, its door and cable entries closed

Packaged Power Houses Built Around the Entire Rig Electrical System

One Power House. Multiple Rig Systems. Engineered to Work Together.

A drilling rig power house brings critical power distribution, conversion and electrical control equipment into a coordinated, maintainable package.

SMEC engineers power house configurations around connected drilling loads, generator capacity, electrical protection, equipment interfaces, installation conditions and transport requirements.

Depending on the project, packages may be designed for skid-mounted, trailer-mounted or appropriately engineered lifting arrangements, with HVAC, lighting, cable-entry systems and auxiliary services.

Drilling Rig Power House Features

  • Custom-engineered Power Control Room (PCR) configurations
  • Generator control and PMS integration
  • VFD or SCR drive-system interfaces, as specified
  • MV/LV switchgear and electrical distribution
  • MCC/PCC and motor-control panels
  • Transformers, protection relays and electrical metering
  • UPS, DC supply and battery-system interfaces
  • PLC/HMI, SCADA and remote-monitoring options
  • HVAC, ventilation, lighting and specified fire-detection interfaces
  • Skid-mounted, trailer-mounted or lifting-compatible arrangements
  • Existing power house upgrades and electrical retrofits

Equipment selection and package configuration depend on the approved electrical design, site conditions and project scope.

Power House System Architecture & Key Components

ComponentTypical Engineering Function
Incoming Power & SwitchgearGenerator or supply connections, electrical distribution and protection
Generator Controls & PMSGenerator synchronisation, load sharing and load-management interfaces
VFD / SCR SystemsPower conversion and motor-drive control for compatible drilling equipment
MCC & PCC PanelsMotor feeders, auxiliary loads and electrical distribution
Transformers & ProtectionVoltage transformation, electrical protection and system coordination
UPS & DC SystemsSpecified backup and control-power requirements
PLC / HMI / SCADAEquipment monitoring, operating status and control interfaces
HVAC & Auxiliary ServicesThermal management, lighting, ventilation and package utilities

Drilling Rig Power House Upgrades & Retrofits

Existing Power House. Obsolete Electrical Equipment?

SMEC can assess existing Power Control Rooms for modernisation, including:

  • Replacement of ageing switchgear, MCC/PCC panels and control equipment
  • VFD/SCR control and drive-system upgrades
  • Generator PMS and synchronisation modifications
  • UPS/DC and protection-relay replacements
  • Electrical feeder expansion and distribution modifications
  • PLC/HMI, metering and monitoring modernisation
  • HVAC and auxiliary electrical-system upgrades

Compatible existing equipment and structural arrangements may be retained following engineering assessment.

Retrofit feasibility depends on equipment condition, electrical ratings, load requirements, available space, thermal performance and approved installation constraints.

Discuss a Rig Power House Retrofit

Applications

  • Onshore Drilling Rigs
  • Offshore Drilling Installations
  • Oilfield Power Systems
  • Rig Refurbishment
  • Rig Reactivation
  • EPC Electrical Packages

SMEC Engineering, Testing & Commissioning

SMEC supports electrical system assessments, power house layout engineering, panel and equipment integration, control-system interfaces, protection coordination and project-specific documentation.

Depending on the approved scope, services may include Factory Acceptance Testing (FAT), electrical and functional verification, transport and installation coordination, Site Acceptance Testing (SAT), commissioning and lifecycle support.

Applicable electrical, structural, environmental, hazardous-area and marine requirements are established according to the project specifications.

Frequently Asked Questions

What is a drilling rig power house?

A drilling rig power house, also called a Power Control Room (PCR) in many installations, is an enclosed electrical package containing selected power distribution, drive-control and automation equipment. Its configuration depends on the rig's generation system, drilling machinery and electrical architecture.

What is the difference between a power house, VFD house and SCR house?

A power house is the broader electrical package, potentially integrating generator controls, switchgear, power distribution and motor-drive systems. A VFD house primarily contains variable-frequency drive equipment for compatible AC motors, while an SCR house provides controlled DC power for applicable drilling equipment.

Can SMEC upgrade an existing drilling rig power house?

Yes. SMEC can assess ageing electrical panels, VFD/SCR equipment, generator controls, PLC/HMI systems, protection devices and auxiliary services for retrofit or replacement, subject to compatibility and engineering verification.

Can drilling rig power houses be designed for remote desert or offshore environments?

Yes, subject to project-specific engineering. Ambient temperature, dust, humidity, corrosion exposure, ventilation, HVAC capacity, access and applicable environmental requirements must be considered during equipment selection and package design.

What is the difference between a power house and an E-House?

A power house describes an electrical package primarily serving power conversion, distribution and control functions. An E-House is a broader term for a prefabricated modular electrical building. The two can overlap depending on the installation and equipment arrangement.

What information is required for a drilling rig power house RFQ?

Share the rig type, generator capacities, electrical single-line diagram, connected-load schedule, VFD/SCR requirements, switchgear and transformer details, enclosure dimensions, mounting arrangement, environmental conditions and project location.

Other SMEC systems

Every system is built to the rig it serves and integrated with the rest of the installation.

All systems

Request a Drilling Rig Power House Technical Assessment

New Rig Electrical Package? Obsolete PCR? Planning a Rig Reactivation?

SMEC can evaluate the required electrical architecture and develop a project-specific power house engineering, integration or modernisation proposal.

Submit RFQ