Middle EastSMEC Oil & Gas Solutions LLCinfo@smecong.com+971 50 249 1903

IndiaSMEC Automation Pvt Ltdsales@smecong.com+91 86060 47714

Oil & gas facilities

Production Facilities E&I & Automation

Production facilities connect separation, compression, pumping, metering, utilities, chemical systems and safety layers. SMEC supports E&I design, control integration, instrumentation, package interfaces, brownfield modifications, testing and digital visibility across these operating systems.

An engineer in an SMEC hard hat and ear defenders checking the local control unit on a pump at a processing plant
Production Facilities

Typical scope

  • PLC/SCADA and package-control integration
  • Instrumentation, metering and shutdown interfaces
  • MCC/VFD and electrical package integration
  • ESD/SIS interfaces subject to project safety requirements
  • Remote monitoring for distributed equipment
  • Brownfield tie-ins, loop checks, SAT and commissioning

Project evidence

  • Case studyOil and gas facilities, including a remote Zone 1 well site

    Oil & Gas Facilities — Retrofit Solutions and Advanced Control Systems

    Problem · SMEC scope · Architecture · Testing · Outcome
    Problem
    Ageing equipment and harsh, hazardous environments: an outdated MCC that had to be retrofitted live, multi-gas detection in Zone 1 areas, a BOP control system on ageing infrastructure, and a remote well site needing reliable telemetry with minimal on-ground supervision.
    SMEC scope
    SMEC retrofitted an MCC with LSIG-configured ACBs, digital motor protection relays and Form 4B panels in a phased retrofit with no downtime; delivered a Gas Watch Panel with SIL-2 sensors and 2oo3 voting; developed primary and secondary injection test kits for protection systems; designed, installed and commissioned a PLC-based BOP control system with ring-topology networking; and built a custom RTU panel for the well site.
    Architecture
    RTU panel in a Zone 1-certified IP66 flameproof enclosure, with redundant 24VDC UPS-backed power, Modbus RTU/TCP and DNP3, fail-safe DI/DO with watchdog timers, data buffering and timestamped event logging, and secure VPN remote access.
    Testing
    RTU panel FAT-tested by SMEC; Gas Watch Panel components verified before deployment.
    Outcome
    RTU panel: seamless SCADA integration across 40+ km of pipeline infrastructure, and on-site intervention reduced by 65%.

Engineering solutions for this industry

Related industries

Have a Production Facilities project to discuss?

Share the existing equipment, drawings, project location and scope of work.

Send the P&IDs, control architecture, cause-and-effect and equipment list. Recommended RFQ inputs: project/asset, existing OEM/model, scope, drawings or specification, required date, site location, and any shutdown/mobilization constraint.

Submit RFQ