Who we support

Engineering Support for Drilling Contractors

Drilling contractors need systems that can be supported across campaigns, moves, reactivations and ageing equipment. SMEC supports rig power, drives, drilling controls, monitoring, safety systems, troubleshooting, retrofit and commissioning from single-system faults to wider modernization programmes.

An engineer in SMEC coveralls and a hard hat walking along a land rig walkway, past electrical enclosures towards the derrick
Drilling Contractors

Where SMEC fits

  • Stacked-rig reactivation
  • Obsolescence and spares risk
  • SCR/VFD/PLC/HMI retrofit
  • DMS, jacking, RPD, BOP, PAGA and Gas Watch
  • Power House and electrical package work
  • Mobilization, FAT/SAT and commissioning

Project evidence

  • Case studyOffshore drilling rig

    Offshore Drilling Rig — SCR System Inspection and Upgrade

    Problem · SMEC scope · Architecture
    Problem
    An ageing SCR system had obsolete modules no longer supported by the OEM, overheating cables, voltage drops, failing relay panels, a mix of control voltages and no local control for the mud pumps. SMEC’s visual, thermal and component inspection, with the onboard technical staff, set out the risks.
    SMEC scope
    SMEC replaced obsolete logic and contactors with a PLC-based control system, fitted new cables and voltage regulation circuits and improved airflow in the SCR compartments, installed a new relay and metering panel, standardised all control circuits to one voltage, and added a dedicated mud pump local panel.
    Architecture
    Seven SCR units: SCR-1 to SCR-4 for draw works and mud pump selection, SCR-5 for mud pump 3 via PLC and VFDs, and SCR-6 and SCR-7 for the top drive.
  • Case studyOffshore jack-up rig

    Jack-up Rig — Retrofit and Synchronization of Six Diesel Generators

    Problem · SMEC scope · Architecture · Testing
    Problem
    An obsolete GE DG control system limited synchronization, load sharing and protection across the rig’s six 1050 kW diesel generators.
    SMEC scope
    SMEC retrofitted all six DGs with modern speed control, AVR and synchronization modules, tuned speed, voltage and droop for balanced load sharing, configured auto deloading and protection schemes, and handed over updated drawings, CT/PT settings and program backups.
    Architecture
    Woodward 2301A governors for speed control, EMRI LX20 AVRs for voltage regulation, and a DEIF PPU300 for automatic synchronization, load sharing and protection; 600 VAC at 1200 RPM across all six generators.
    Testing
    Each DG started and calibrated individually; manual synchronization by synchroscope, then automatic synchronization through the PPU300; protections verified. All six DGs ran stably and passed the rig endurance test and jacking operations under real load.
  • Case studyFour-legged electrohydraulic jack-up rig

    Jack-up Rig — PLC Upgrade for Jacking System Control

    Problem · SMEC scope · Architecture
    Problem
    An offshore drilling contractor needed a simple, reliable PLC control system for the hydraulic functions of its four-legged electrohydraulic jack-up system, to improve the efficiency, safety and precision of jacking operations.
    SMEC scope
    SMEC developed the PLC-based jacking control system, integrated the motor control station with an alarm panel and SCR interfacing, installed analogue stroke movement monitors on the hydraulic cylinders and an inclination monitoring and alarm system, and upgraded communication to optic fiber.
    Architecture
    PLC jacking control, motor control station with alarm panel and SCR interface, four analogue stroke movement monitors, inclination monitoring and alarms, and an optic fiber communication link.

Engineering solutions for this industry

Related industries

Have a Drilling Contractors project to discuss?

Share the existing equipment, drawings, project location and scope of work.

Send the rig, system, current fault/obsolescence issue and campaign date. Recommended RFQ inputs: project/asset, existing OEM/model, scope, drawings or specification, required date, site location, and any shutdown/mobilization constraint.

Submit RFQ