Middle EastSMEC Oil & Gas Solutions LLCinfo@smecong.com+971 50 249 1903

IndiaSMEC Automation Pvt Ltdsales@smecong.com+91 86060 47714

Products

Generator Control & Power Management Systems

Generator control and PMS coordinate generator availability, synchronization, load sharing, protection interfaces, load shedding and recovery so the electrical system responds predictably as loads change.

An L-shaped line-up of switchboard panels in a workshop, with meters, breakers and control modules on their front doors

Generator PMS That Manages the Transition, Not Just the Steady State

Power management is tested when the load changes, a generator trips or the bus must recover. SMEC engineers generator controls around synchronisation, kW/kVAr sharing, load shedding, protection and operating sequences for isolated and grid-connected systems.

2026 market / lifecycle context

More electrified and automation-heavy assets make generator coordination and blackout recovery increasingly important, especially on rigs, vessels and isolated facilities.

System architecture / typical scope

  • Generator controller interfaces
  • Automatic synchronization
  • Load sharing
  • Load shedding / priority logic
  • Bus-tie and breaker interfaces
  • Auto-start / recovery logic
  • SCADA/HMI/PMS visualization

What SMEC can support

  • Requirements and interface review
  • Detailed engineering and approved component selection
  • Panel/package build or integration within SMEC capability
  • Software/configuration where applicable
  • FAT and documentation
  • Site integration, SAT and commissioning
  • Retrofit, troubleshooting and lifecycle support

Applications

  • Drilling rigs
  • Offshore platforms
  • Marine vessels
  • Captive power plants

How it works

Synchronisation — Voltage, frequency, phase-angle and breaker permissives govern synchronising and dead-bus closing.

Load control — Governor and AVR interfaces coordinate active/reactive load sharing, generator starts/stops and operating modes.

Disturbance response — Priority load shedding, bus transfer and blackout recovery logic should be verified against realistic failure cases.

Diagnostics — Event logs, breaker status, generator measurements and protection alarms support fault analysis.

Key components

Synchronising and breaker controls. The synchronising and breaker controls is selected for the equipment, operating duty and site conditions.

Load sharing. Load measurement requires a verified mechanical load path, correctly sized sensor, signal conditioning and traceable calibration.

Automatic start/stop. The automatic start/stop is selected for the equipment, operating duty and site conditions.

Load shedding. Load measurement requires a verified mechanical load path, correctly sized sensor, signal conditioning and traceable calibration.

Bus tie logic. The bus tie logic is selected for the equipment, operating duty and site conditions.

Blackout recovery. The blackout recovery is selected for the equipment, operating duty and site conditions.

Alarms. Alarm thresholds, priorities, delays and operator actions must be documented to avoid nuisance alarms and missed critical events.

Generator and engine interfaces. The generator connection must accommodate voltage/frequency variation, transient load steps, breaker status and coordinated protection. Interface signals should be identified in the single-line diagram and I/O schedule.

Upgrades & retrofits

Replace legacy synchronisers and PMS controllers while preserving verified protection.

Add priority load-shedding and blackout recovery sequences.

Integrate additional generators after load-sharing and fault studies.

Retrofit scope depends on existing OEM interfaces, component condition, available space, shutdown windows and the approval basis of any safety-related functions.

Testing & documentation

Relevant IEC, ISO, API, classification-society, hazardous-area or functional-safety requirements must be selected according to the specific system and installation. Where applicable, the project package may include electrical drawings, GA layouts, datasheets, I/O schedules, cause-and-effect, communication lists, inspection records, FAT/SAT procedures, calibration records and as-built documents. No unverified compliance certification is claimed here.

Project evidence

  • Case studyOffshore rig, Dubai

    Offshore Rig — Emergency MCC, Transformer and DG Switchboard Upgrade

    Problem · SMEC scope · Architecture · Testing
    Problem
    The rig’s emergency power system needed upgrading to improve reliability, efficiency and safety in emergencies, minimise downtime and make maintenance easier.
    SMEC scope
    SMEC designed, manufactured, supplied, installed and commissioned a DG switchboard panel in the MSB room, a DG power isolation panel near the generator, a new transformer and a new Emergency Motor Control Centre, and supplied, installed and commissioned a new emergency generator excitation unit.
    Architecture
    Main switchboard extended with 100x8mm copper bus bars, 4-run per phase, and an additional generator section; 1250 kVA, 600/480 V delta-star dry-type transformer with Class H insulation; modular EMCC with compact bus bars in a prefabricated enclosure for a constrained space; arc-fault detection relays on the isolation panel; Basler excitation unit for the 1625 kVA, 1300 kW emergency alternator.
    Testing
    Load flow analysis for the switchboard extension; harmonic analysis and insulation testing on the transformer; real-time voltage regulation testing and excitation tuning on the generator. Every item installed and commissioned, and confirmed working by rig staff.
  • Case studyOffshore jack-up rig

    Jack-up Rig — Retrofit and Synchronization of Six Diesel Generators

    Problem · SMEC scope · Architecture · Testing
    Problem
    An obsolete GE DG control system limited synchronization, load sharing and protection across the rig’s six 1050 kW diesel generators.
    SMEC scope
    SMEC retrofitted all six DGs with modern speed control, AVR and synchronization modules, tuned speed, voltage and droop for balanced load sharing, configured auto deloading and protection schemes, and handed over updated drawings, CT/PT settings and program backups.
    Architecture
    Woodward 2301A governors for speed control, EMRI LX20 AVRs for voltage regulation, and a DEIF PPU300 for automatic synchronization, load sharing and protection; 600 VAC at 1200 RPM across all six generators.
    Testing
    Each DG started and calibrated individually; manual synchronization by synchroscope, then automatic synchronization through the PPU300; protections verified. All six DGs ran stably and passed the rig endurance test and jacking operations under real load.

Common questions

Can Generator Control & Power Management Systems be supplied for new build, retrofit or replacement?

The lifecycle route depends on the installed base, condition, interfaces, obsolescence and project requirements. SMEC can assess new-build, retrofit, repair or replacement scope where technically valid.

Can existing field wiring or interfaces be retained?

Possibly. Retention depends on survey findings, condition, ratings, compatibility, safety requirements, documentation and the cutover strategy.

What information is required for quotation?

Send the make/model or required specification, datasheets, drawings, ratings, interfaces, fault details where applicable, site location and required date or shutdown/mobilization window.

Can an existing PMS be modernised without replacing generators?

Often yes, subject to governor, AVR, breaker and protection compatibility.

What is the difference between load sharing and load shedding?

Load sharing distributes demand among online generators; load shedding disconnects selected loads when supply is insufficient.

What data is needed?

Generator ratings, SLD, breaker details, governor/AVR data and operating philosophy.

Have a Generator Control & Power Management Systems project to discuss?

Share the existing equipment, drawings, project location and scope of work.

Generator data, SLD, breaker/protection details, operating philosophy, load list, existing PMS/controller make and blackout/load-shedding philosophy.

Submit RFQ