Drilling & offshore
Offshore Drilling Rig Electrical, Control & Safety Systems
Offshore drilling rigs contain multiple independent but interconnected electrical, control, safety and mechanical systems. Power generation and distribution, SCR/VFD drives, drilling controls, jacking systems, BOP controls, drilling monitoring, gas detection, PAGA, CCTV and auxiliary packages may come from different OEMs and different generations of technology. SMEC works at the interfaces between these systems — engineering new packages, integrating multi-OEM equipment, troubleshooting existing installations, replacing obsolete controls and preparing ageing rigs for reactivation or another drilling campaign.

Offshore Drilling
Explore engineering capabilities
Power & electrical
- Generators and generator-control interfaces
- Main/auxiliary switchboards and transformers
- SCR and VFD drive systems
- MCCs, distribution and package panels
- UPS/DC systems and battery chargers
- Power/control houses and PMS interfaces
Drilling & machinery controls
- Drilling control architecture and package interfaces
- DMS3000 drilling monitoring and operator displays
- PLC/HMI/control networks
- Jacking control and load/RPD monitoring
- Drive, brake, gearbox and machinery diagnostic interfaces where within scope
Safety & well-control interfaces
- BOP control-system interfaces
- Drilling-mud Gas Watch / gas detection
- ESD and shutdown interfaces
- PAGA and communications
- Hazardous-area CCTV/video systems
- Flare ignition systems where applicable
Modernization
Obsolete PLC/HMI replacement, legacy control migration, drive replacement, panel refurbishment, I/O migration, network/protocol conversion, documentation recovery and staged cutover.
Reactivation workflow
Installed-base assessment → obsolete/failed equipment identification → repair/replace decision → engineering → software/configuration → panel modification → FAT → mobilization → installation → SAT/commissioning.
Project evidence

Offshore Drilling Rig — Real-Time Remote Monitoring of Drilling Instrument Parameters
Problem · SMEC scope · Architecture
- Problem
- An offshore oil and gas operator needed secure, real-time access to critical drilling instrument parameters from remote offices, without modifying the existing control systems.
- SMEC scope
- SMEC designed and deployed a real-time remote monitoring system on its own Edge IoT unit, reading data already available in the existing Drilling Management System (DMS) PLC — no additional instrumentation — and publishing it to an authenticated cloud application.
- Architecture
- Ethernet handshake between the DMS PLC and the SMEC Edge IoT unit over CAT 6 cabling and industrial-grade switches; data pushed to AWS Cloud at user-configurable intervals, with up to 4 concurrent authenticated users per location and error alerts on remote PCs if the internet link fails.

Offshore Rig — 1350 HP Top Drive VFD System Panel
Problem · SMEC scope · Architecture · Testing
- Problem
- An offshore operator needed a high-capacity 1350 HP top drive VFD system panel that would deliver precise control and survive extreme drilling conditions from -20°C to +50°C, plugging into the existing rig power and control systems with no margin for retrofit errors offshore.
- SMEC scope
- SMEC supplied and installed the complete top drive VFD system in a 20-ft container: drive section, auxiliary section, distribution panel with step-down transformer, PLC section and plug panels for all incoming and outgoing feeders.
- Architecture
- Oil-cooled heavy-duty VFD on a 600 VAC, 1800 A, 3-phase supply, with custom drive tuning, harmonic filters and surge protection; segregated drive, PLC and auxiliary zones; dual redundant 5-ton AC units under PLC cooling control; multi-point fire detection linked to ESD logic, and PLC alarms for temperature, humidity and doors.
- Testing
- Full logic tested before deployment, and FAT simulated with the client before shipment.

Offshore Drilling Rigs — In-Situ Repair of AC and DC Modules, PCBs and ACBs
Problem · SMEC scope · Testing · Outcome
- Problem
- Under a rate contract, the operator needed a partner to diagnose and repair complex PCB systems across critical rig zones — driller’s console, engine room and control room — on non-standard legacy hardware degraded by salt-laden air, including failing surge suppression and power limit PCBs that affected generator safety.
- SMEC scope
- SMEC deployed a marine electronics team for in-situ and workshop repair of AC and DC modules, PCBs, heat sink–IGBT assemblies and air circuit breakers: reverse engineering of damaged PCBs on proprietary test jigs, hot-swap module servicing to keep rigs running, remote support to rig crews, and tracked logistics from the helibase to SMEC’s facility and back.
- Testing
- Functional simulation of generator exciter and auxiliary motor control PCBs before reinstallation; onboard functional testing with portable test benches and calibrated instruments; electro-thermal profiling of heat sinks; testing and calibration of 460V/600V AC ACBs. Every job documented with test logs and compliance records.
- Outcome
- PCB turnaround cut from 10–12 days to 72–96 hours; equipment downtime from 18+ hours to under 6 hours on average; ACB fault recurrence from 2x a month to 0 over 90 days+; field module failure below 1% after service, with 100% component functionality restored.

Offshore Drilling Rig — SCR System Inspection and Upgrade
Problem · SMEC scope · Architecture
- Problem
- An ageing SCR system had obsolete modules no longer supported by the OEM, overheating cables, voltage drops, failing relay panels, a mix of control voltages and no local control for the mud pumps. SMEC’s visual, thermal and component inspection, with the onboard technical staff, set out the risks.
- SMEC scope
- SMEC replaced obsolete logic and contactors with a PLC-based control system, fitted new cables and voltage regulation circuits and improved airflow in the SCR compartments, installed a new relay and metering panel, standardised all control circuits to one voltage, and added a dedicated mud pump local panel.
- Architecture
- Seven SCR units: SCR-1 to SCR-4 for draw works and mud pump selection, SCR-5 for mud pump 3 via PLC and VFDs, and SCR-6 and SCR-7 for the top drive.

Jack-up Rig — Retrofit and Synchronization of Six Diesel Generators
Problem · SMEC scope · Architecture · Testing
- Problem
- An obsolete GE DG control system limited synchronization, load sharing and protection across the rig’s six 1050 kW diesel generators.
- SMEC scope
- SMEC retrofitted all six DGs with modern speed control, AVR and synchronization modules, tuned speed, voltage and droop for balanced load sharing, configured auto deloading and protection schemes, and handed over updated drawings, CT/PT settings and program backups.
- Architecture
- Woodward 2301A governors for speed control, EMRI LX20 AVRs for voltage regulation, and a DEIF PPU300 for automatic synchronization, load sharing and protection; 600 VAC at 1200 RPM across all six generators.
- Testing
- Each DG started and calibrated individually; manual synchronization by synchroscope, then automatic synchronization through the PPU300; protections verified. All six DGs ran stably and passed the rig endurance test and jacking operations under real load.

Jack-up Rig — PLC Upgrade for Jacking System Control
Problem · SMEC scope · Architecture
- Problem
- An offshore drilling contractor needed a simple, reliable PLC control system for the hydraulic functions of its four-legged electrohydraulic jack-up system, to improve the efficiency, safety and precision of jacking operations.
- SMEC scope
- SMEC developed the PLC-based jacking control system, integrated the motor control station with an alarm panel and SCR interfacing, installed analogue stroke movement monitors on the hydraulic cylinders and an inclination monitoring and alarm system, and upgraded communication to optic fiber.
- Architecture
- PLC jacking control, motor control station with alarm panel and SCR interface, four analogue stroke movement monitors, inclination monitoring and alarms, and an optic fiber communication link.

2000 HP Drilling Rig — Full Reactivation of the VFD System
Problem · SMEC scope · Architecture · Testing · Outcome
- Problem
- The rig faced critical downtime with inactive, aged drive systems: a dismantled generator control system with missing ACBs, bus bars, PTs, CTs and AVRs, damaged panels and wiring, crane-damaged enclosures, missing static converters and harmonic filters, and a water-damaged BOP control panel.
- SMEC scope
- SMEC restored and reactivated the VFD system with the VFD house, driller’s console, TDS house, MCC and BCU: replaced ACBs, AVRs, PTs and CTs, serviced reusable Woodward controllers, built new copper bus bars, rewired and reconditioned the panels, rebuilt the enclosures, installed ABB VFDs and filters, and supplied a new PLC-based BOP control system. Engineering and as-fitted drawings were delivered.
- Architecture
- Three VFDs for generator, draw works and rotary; PLC ladder logic and Woodward governor PID loops reconfigured and VFD parameters synced with generator load sharing; PLC monitoring of power factor and phase imbalance; BOP logic linked to remote monitoring over redundant fiber optics, with full diagnostics from the driller’s console.
- Testing
- Insulation resistance, continuity checks and load calculations on the rewired panels; interlocks simulated before live testing. The system passed FAT.
- Outcome
- System uptime from offline to 100% operational; remote command response under 1.5 sec; power load management stable with auto sync; fully energized within the drydock schedule.
Common questions
What scope can SMEC support for Offshore Drilling Rig Electrical & Control Systems?
SMEC can support the electrical, instrumentation, automation, control, integration, modernization, testing and commissioning elements described on this page, subject to the agreed project boundary.
Can SMEC work with an existing multi-OEM installed base?
Yes where the required technical information, access, interfaces and project approvals are available. Compatibility and scope boundaries are assessed before execution.
What information is needed to quote?
Send the asset or project, existing make/model where relevant, drawings or specification, required scope, site, required date and any shutdown or mobilization constraint.
Engineering solutions for this industry
Related industries
Have an Offshore Drilling project to discuss?
Share the existing equipment, drawings, project location and scope of work.
Send the rig name/type, system make/model, drawings, fault history and mobilization window. Recommended RFQ inputs: project/asset, existing OEM/model, scope, drawings or specification, required date, site location, and any shutdown/mobilization constraint.