Engineering case studies

  • Case studyOffshore drilling rig

    Offshore Drilling Rig — Real-Time Remote Monitoring of Drilling Instrument Parameters

    Problem · SMEC scope · Architecture
    Problem
    An offshore oil and gas operator needed secure, real-time access to critical drilling instrument parameters from remote offices, without modifying the existing control systems.
    SMEC scope
    SMEC designed and deployed a real-time remote monitoring system on its own Edge IoT unit, reading data already available in the existing Drilling Management System (DMS) PLC — no additional instrumentation — and publishing it to an authenticated cloud application.
    Architecture
    Ethernet handshake between the DMS PLC and the SMEC Edge IoT unit over CAT 6 cabling and industrial-grade switches; data pushed to AWS Cloud at user-configurable intervals, with up to 4 concurrent authenticated users per location and error alerts on remote PCs if the internet link fails.
  • Case studyOffshore drilling rig

    Offshore Rig — 1350 HP Top Drive VFD System Panel

    Problem · SMEC scope · Architecture · Testing
    Problem
    An offshore operator needed a high-capacity 1350 HP top drive VFD system panel that would deliver precise control and survive extreme drilling conditions from -20°C to +50°C, plugging into the existing rig power and control systems with no margin for retrofit errors offshore.
    SMEC scope
    SMEC supplied and installed the complete top drive VFD system in a 20-ft container: drive section, auxiliary section, distribution panel with step-down transformer, PLC section and plug panels for all incoming and outgoing feeders.
    Architecture
    Oil-cooled heavy-duty VFD on a 600 VAC, 1800 A, 3-phase supply, with custom drive tuning, harmonic filters and surge protection; segregated drive, PLC and auxiliary zones; dual redundant 5-ton AC units under PLC cooling control; multi-point fire detection linked to ESD logic, and PLC alarms for temperature, humidity and doors.
    Testing
    Full logic tested before deployment, and FAT simulated with the client before shipment.
  • Case studyA national oil company’s offshore drilling rigs

    Offshore Drilling Rigs — In-Situ Repair of AC and DC Modules, PCBs and ACBs

    Problem · SMEC scope · Testing · Outcome
    Problem
    Under a rate contract, the operator needed a partner to diagnose and repair complex PCB systems across critical rig zones — driller’s console, engine room and control room — on non-standard legacy hardware degraded by salt-laden air, including failing surge suppression and power limit PCBs that affected generator safety.
    SMEC scope
    SMEC deployed a marine electronics team for in-situ and workshop repair of AC and DC modules, PCBs, heat sink–IGBT assemblies and air circuit breakers: reverse engineering of damaged PCBs on proprietary test jigs, hot-swap module servicing to keep rigs running, remote support to rig crews, and tracked logistics from the helibase to SMEC’s facility and back.
    Testing
    Functional simulation of generator exciter and auxiliary motor control PCBs before reinstallation; onboard functional testing with portable test benches and calibrated instruments; electro-thermal profiling of heat sinks; testing and calibration of 460V/600V AC ACBs. Every job documented with test logs and compliance records.
    Outcome
    PCB turnaround cut from 10–12 days to 72–96 hours; equipment downtime from 18+ hours to under 6 hours on average; ACB fault recurrence from 2x a month to 0 over 90 days+; field module failure below 1% after service, with 100% component functionality restored.
  • Case studyOffshore drilling rig

    Offshore Drilling Rig — SCR System Inspection and Upgrade

    Problem · SMEC scope · Architecture
    Problem
    An ageing SCR system had obsolete modules no longer supported by the OEM, overheating cables, voltage drops, failing relay panels, a mix of control voltages and no local control for the mud pumps. SMEC’s visual, thermal and component inspection, with the onboard technical staff, set out the risks.
    SMEC scope
    SMEC replaced obsolete logic and contactors with a PLC-based control system, fitted new cables and voltage regulation circuits and improved airflow in the SCR compartments, installed a new relay and metering panel, standardised all control circuits to one voltage, and added a dedicated mud pump local panel.
    Architecture
    Seven SCR units: SCR-1 to SCR-4 for draw works and mud pump selection, SCR-5 for mud pump 3 via PLC and VFDs, and SCR-6 and SCR-7 for the top drive.