Lifecycle & Execution

Shutdown & Turnaround Support

Shutdown windows compress engineering, access, manpower and commissioning into a fixed period. SMEC supports defined electrical, instrumentation and automation scopes with pre-shutdown engineering, material readiness, execution planning, loop checks, SAT and handover.

Motor control centre and switchboard cabinets installed on an offshore rig
Shutdown & Turnaround Support

Make the Shutdown Window Count.

A planned outage compresses many interdependent tasks into a fixed period. Electrical modifications, instrumentation checks, PLC changes, protection testing and restart verification need clear work packs and pre-tested interfaces before site execution begins.

SMEC supports defined electrical, automation and instrumentation scopes through survey, pre-staging, testing, troubleshooting, SAT and handover.

Explore engineering capabilities

Typical scope

  • Pre-shutdown survey and work packs
  • Instrument replacement and calibration
  • Panel/control modifications
  • Cable/termination and loop work
  • PLC/HMI changes
  • Functional testing and commissioning
  • Punch closure and as-built updates

Applications & Systems

Select a related system to open its dedicated product or system page.

Project Evidence

Refinery Turnaround — Electrical and Instrumentation Restart Support

A scheduled plant shutdown provided a limited window for inspection and corrective work. The project summary covers protection checks, instrument loop testing, control backups and restart readiness.

  • Case studyDrilling rig in dry dock

    Drilling Rig in Dry Dock — Gas Detection and Pneumatic System Repair

    Problem · SMEC scope · Architecture · Testing · Outcome
    Problem
    Before the rig could return to service from dry dock, its gas alarm system was in critical condition and non-compliant, with corrosion inside the gas watch panel, a 4–5 second delay in leak response and erratic pneumatic regulators.
    SMEC scope
    SMEC refurbished the gas watch panel and recalibrated its detection thresholds, supplied and installed OEM-grade H₂S detectors, Ex purge controllers and isolator barriers, replaced the display units and the Ex junction-box cable connector, and replaced the pneumatic regulators and gas trap motors with faster-response units.
    Architecture
    Compatibility of the new detectors and display units verified with the rig’s SCADA and alarm interface.
    Testing
    Full system recalibration with gas simulation kits; leak testing and pressure profiling under simulated H₂S discharge; on-site function testing of every alarm, response and shut-off sequence; traceable test reports and certification to offshore audit protocols.
    Outcome
    Leak response time cut from a 4–5 sec delay to under 1.2 sec; gas alarm system health from critical to fully restored; compliance from non-compliant to ready for commissioning; rig cleared for recommissioning within the scheduled dry dock timeline.

Engineering Approach — The outage is won before it starts

A shutdown scope needs to be converted into executable work packs long before the outage begins. Site surveys, drawings, material availability, controller backups, isolation interfaces, testing responsibilities and contingencies should be resolved as far as practical in advance.

During the outage, electrical and instrumentation work must align with control changes, permit constraints and the restart sequence. Traceable test results, open-item management and coordinated SAT are as important as completing the physical modifications within the planned window.

Common questions

How early should a shutdown scope be reviewed?

Early enough to complete surveys, drawings, backups, materials review and any pre-staged FAT before the outage starts.

Can PLC changes and instrument calibration be coordinated?

Yes, as a defined scope with work packs, test records, interface checks and restart responsibilities.

What is needed for an outage quotation?

Shutdown dates, work packs, equipment lists, drawings, site access conditions and test requirements.

Have a Shutdown & Turnaround project to discuss?

Share the existing equipment, drawings, project location and scope of work.

Send the shutdown dates, work list and approved scope. Recommended RFQ inputs: project/asset, existing OEM/model, scope, drawings or specification, required date, site location, and any shutdown/mobilization constraint.

Submit RFQ